At Tomlinson & Carruthers we undertake a variety of
projects. Please select a category for some recent
examples.
Listed
Projects:
Craggy Range
Pahaoa
Glenburn Station
Craggy Range Winery |
|
 |
 |
| |
|
|
| |
Client |
 |
Craggy
Range Winery Limited |
 |
| |
|
|
| Job |
|
Te
Muna Road Vineyard, Martinborough |
| |
|
|
| Short Description |
|
Topographic
Survey for Vineyard, Managers House, Winery
and Dam Site, Vineyard Design and Set out.
|
| |
|
|
| Detail |
|
The
client required detailed levels around the area
of the proposed winery and managers house
for architectural and engineering design. Height
information had to be correlated between these
buildings on the higher terrace, and the dam and
lower vineyard terrace for hydraulic drainage.
New vineyard blocks had to be designed to match
existing vine rows and site features, and set out
when required.
The scale of the site provided one challenge,
being nearly 170 hectares. With several high
terraces and sloping terrain, level control
between sections of the vineyard required careful
control. Setting out for new vine rows was done
in the middle of winter, with the area
experiencing some very sharp frosts. The
equipment still works well in the cold, but the
surveyors work marginally slower!
Areas that required detailed site information
were surveyed in terms of a known height datum,
and in relation to the boundaries of the lots.
All site features, fences and banks were fixed
and related to aerial photographs. From this
information, the area of new vineyard blocks
could be calculated to fit the site and ensure
the rows flowed from block to block.
Topographic information was gained by EDM and GPS
surveying. GPS made the transferring of heights
very easy, and this was checked by EDM
observations from each terrace level. Setting out
of vine rows was also done by both methods. It
was easy to sight through the EDM over a long
distance to keep vine rows straight, while
calculated row positions were quickly set out by
EDM. On site adjustment of the rows was possible
to fit new client requests.
The topographic survey ensured that new buildings
could be oriented correctly on site for maximum
functionality. By fixing heights, the design of a
future multi-floored winery building could be
achieved, allowing for the most productive flow
of the grapes and wine through the winery. The
dam was constructed from our site plan, allowing
water for frost control and irrigation. We helped
the client maximise the area under production,
and ensure that the look of the vineyard was
right.
Please click on the images below to the left to
view a closer look. The images are large and will
load in a separate window.
|
| |
|

|
The topographical survey of
the Craggy Range site before the dam in designed.
|

|
The completed dam.
|

|
The lower terrace showing
the completed vineyards.
|

|
The Manager's House
overlooking the lower terraces, dam and expansive
valley.
|
| |
|
Return to Top of Page
|
| |
|
 |
|
 |
Glenburn Station |
|
 |
 |
| |
|
|
| |
Client |
 |
Glenburn
Station 2007 Limited |
 |
| |
|
|
| Job |
|
Glenburn
Station Subdivision |
| |
|
|
| Short Description |
|
Planning,
topographical survey and land survey of coastal
rural subdivision. |
| |
|
|
| Status |
|
Planning |
| |
|
|
| Detail |
|
When
the owners of one of the oldest and largest
stations in the country needed to reorganize
their landholdings they looked for two things -
local knowledge and efficiency. Tomlinson &
Carruthers had a relationship of over 50 years
surveying the coastal station and kept up with
the times by using GPS.
The site itself is expansive and varied.
Totalling over 6300 hectares the site includes
coastal cliffs and dunes, river valleys and steep
hill country. There is bush, forest and pasture
throughout and sensitive flora and fauna sites
along the coast. Planning will involve Tomlinson
& Carruthers leading a team of specialists to
achieve the most sustainable results. Surveying
the existing coastline and access tracks will
involve several teams of surveyors and
technicians utilising GPS surveying equipment.
|
| |
|
|
|
| |
|

|
A digital terrain model of
the site looking north along the coast with the
scheme overlaid.
|

|
A digital terrain model of
the site looking west from the coast with the
scheme overlaid.
|
Return to Top of Page
|
|
| |
|
 |
|
 |
|
 |