Home
Services
People
Projects
Community
Environment
Newsroom
Links
Contact
Urban
Rural
Industrial
Industrial
Lifestyle
Coastal
Community
Infrastructure



At Tomlinson & Carruthers we undertake a variety of projects. Please select a category for some recent examples.


Listed Projects:
Solway Industrial Estate
Waingawa
Thomsons Trail Winery
Juken New Zealand (JNL)


Solway Industrial Estate  
     
  Client Solway Properties Limited
     
Job   Solway Industrial Estate, Ngaumutawa Road, Masterton
     
Short Description   Design, Planning, Topographical Survey, Urban Design, Civil Engineering, Subdivision Survey, Setout & Project Management of urban light industrial/ heavy commercial development.
     
Status   Completed
     
Detail   The site bordered by State Highway 2, the Masterton bypass and the Wairarapa Railway Line was ideal for a heavy commercial and light industrial park. 20 lots of between 1000sqm and 5555sqm were designed to provide efficient access to infrastructure and minimize conflicts with neighbouring uses of land.

The design of the road network was the most important aspect of the design for the subdivision. While access to the State Highway frontage was not desirable, the access corridor to the bypass was adjacent to a primary school. The solution was an integrated traffic management plan incorporating the relocation of pedestrian crossings and redesign of parking, intersections and railway crossings.The development has been a resounding success with the last lots sold in 2006.

   

The scheme plan for the development. Central to the design of the development was the provision for heavy vehicle access.




An aerial photograph of the completed subdivision.



Return to Top of Page

 
   
 



Waingawa  
     
  Client Gillies Group Limited
     
Job   Waingawa Industrial Park, Waingawa, Carterton District.
     
Short Description   Design, Planning, Topographical Survey, Urban Design, Civil Engineering, Subdivision Survey, Setout & Project Management of rural industrial development.
     
Status   Construction
     
Detail   Waingawa has been identified as one of the key growth areas of the Greater Wellington Region. The Gillies Group shared this vision when they approached Tomlinson & Carruthers to design and implement an industrial subdivision on the outskirts of Masterton between the State Highway 2 and Wairarapa Railway.

As part of the planning process Tomlinson & Carruthers were involved with consultation with Transit New Zealand, the Carterton District Council and the Greater Wellington Regional Council to ensure that the future development area had the optimal integration of infrastructure. Our team of surveyors and specialist staff designed and are monitoring the construction phase and will project manage the project until completion.
   

A scheme plan of the development. An essential element of the design of the development is the integration of services with the road design.




An aerial photograph of the Waingawa Area with the scheme overlaid. The location, between the railway and roading arteries so close to an urban area is ideal for rural industrial development.


   

Return to Top of Page

   
 



Thomsons Trail Winery  
     
  Client Thomsons Trail Winery
     
Job   Winery & Cellars Project.
     
Short Description   Planning, topographical survey and setouts.
     
Status   Construction
     
Detail   Tomlinson & Carruthers have been involved with several stages of the development of Thomsons Trail Winery ranging from the first setout of the vines, to the topographical survey for the irrigation dam to the more recent planning for the winery and buildings.

The team at Tomlinson & Carruthers have experience with the viticulture industry and Thomsons Trail Winery recognised this when they approached the firm.


   

A topographical plot of the new winery site and irrigation dam.




A schematic of the vineyard site showing the location of grape varieties, irrigation infrastructure, buildings and access.


   

Return to Top of Page

   
 



Juken New Zealand (JNL)  
     
  Client Juken New Zealand Limited
     
Job   Processing plant, Waingawa, Carterton District
     
Short Description   Setout of industrial buildings.
     
Status   Completed
     
Detail   When the foundations for a building with dimensions of almost 200 metres in length need to be set out, and most of the building components are pre-fabricated off site, precision measuring equipment is required. Tomlinson & Carruthers set out the foundations for the buildings using a combination of laser assisted total stations and Global Positioning System surveying equipment to ensure accuracy to within millimetres.

   

Aerial photograph of the JNL site at Waingawa. Some of the buildings are almost 200 metres long.
Photo courtesy Google Earth.



Return to Top of Page