Home
Services
People
Projects
Community
Environment
Newsroom
Links
Contact
Urban
Rural
Industrial
Industrial
Lifestyle
Coastal
Community
Infrastructure



At Tomlinson & Carruthers we undertake a variety of projects. Please select a category for some recent examples.


Listed Projects:

Pack 'n Save
ASB Bank
Beaurepaires



Pack 'n Save  
     
  Client Foodstuffs New Zealand Limited & Mainzeal
     
Job   Pack 'n Save, Chapel Street, Masterton
     
Short Description   Topographical survey & setout of supermarket, carpark, utilities & petrol station.
     
Status   Completed
     
Detail   The client had a concept that Tomlinson & Carruthers extended & implemented to a fully designed development.

Initially, Tomlinson & Carruthers were approached for the planning and land surveying to remove the existing dwellings from the site to other sites throughout the Wairarapa. The firm was then involved with various aspects of the land survey for site preparation, topographical survey and then setout of the buildings, parking and the petrol station.


   
Return to Top of Page


 
   
 



ASB Bank  
     
  Client ASB Bank Limited.
     
Job   ASB Bank, Queen Street, Masterton, Wairarapa.
     
Short Description   Topographical survey and site setout.
     
Status   Completed
     
Detail   As a new business to the Wairarapa, ASB Bank sought the experience of the region's oldest surveying firm for the layout of their first branch in Masterton.

Tomlinson & Carruthers worked with the client to set out the footprint for the building and prepare as built plans for utilities.

   
Return to Top of Page

 
 


Beaurepaires  
     
  Client Masterton Trust Lands Trust
     
Job   Beaurepaires, Corner of Bannister & Dixon Streets, Masterton.
     
Short Description   Topographical survey and site setout.
     
Status   Completed
     
Detail   Located on a busy intersection, Beaurepaires needed to utilise the site to its maximum potential both from a profile perspective and a space management approach. Access by customers and road safety was a key element. Tomlinson & Carruthers were involved in the set out of the building to ensure that all these objectives were acheived.

   
Return to Top of Page