








 |
At Tomlinson & Carruthers we undertake a variety of
projects. Please select a category for some recent
examples.
Listed
Projects:
Pack 'n Save
ASB
Bank
Beaurepaires
Pack 'n Save |
|
 |
 |
| |
|
|
| |
Client |
 |
Foodstuffs
New Zealand Limited & Mainzeal |
 |
| |
|
|
| Job |
|
Pack
'n Save, Chapel Street, Masterton |
| |
|
|
| Short Description |
|
Topographical
survey & setout of supermarket, carpark,
utilities & petrol station. |
| |
|
|
| Status |
|
Completed |
| |
|
|
| Detail |
|
The
client had a concept that Tomlinson &
Carruthers extended & implemented to a fully
designed development.
Initially, Tomlinson & Carruthers were
approached for the planning and land surveying to
remove the existing dwellings from the site to
other sites throughout the Wairarapa. The firm
was then involved with various aspects of the
land survey for site preparation, topographical
survey and then setout of the buildings, parking
and the petrol station.
|
| |
|
Return to Top of Page
|
|
| |
|
 |
|
 |
ASB Bank |
|
 |
 |
| |
|
|
| |
Client |
 |
ASB
Bank Limited. |
 |
| |
|
|
| Job |
|
ASB
Bank, Queen Street, Masterton, Wairarapa. |
| |
|
|
| Short Description |
|
Topographical
survey and site setout. |
| |
|
|
| Status |
|
Completed |
| |
|
|
| Detail |
|
As a
new business to the Wairarapa, ASB Bank sought
the experience of the region's oldest surveying
firm for the layout of their first branch in
Masterton.
Tomlinson & Carruthers worked with the client
to set out the footprint for the building and
prepare as built plans for utilities.
|
| |
|
Return to Top of Page
|
|
 |
|
 |
Beaurepaires |
|
 |
 |
| |
|
|
| |
Client |
 |
Masterton
Trust Lands Trust |
 |
| |
|
|
| Job |
|
Beaurepaires,
Corner of Bannister & Dixon Streets,
Masterton. |
| |
|
|
| Short Description |
|
Topographical
survey and site setout. |
| |
|
|
| Status |
|
Completed |
| |
|
|
| Detail |
|
Located
on a busy intersection, Beaurepaires needed to
utilise the site to its maximum potential both
from a profile perspective and a space management
approach. Access by customers and road safety was
a key element. Tomlinson & Carruthers were
involved in the set out of the building to ensure
that all these objectives were acheived.
|
| |
|
Return to Top of Page
|
|
| |
|
 |
|
 |
|
 |